EICR and electrical surveys in Clapham
Bello Electrics Ltd carries out EICR and electrical surveys in Clapham, giving you a written account of your property's wiring condition and the repairs it needs.
Calls answered 24/7
- 3 years trading
What does an EICR in Clapham cost?
Our EICR starting price covers examination and electrical tests of domestic wiring. The number of circuits affects the inspection price, while property size and access affect the time needed for testing.
From £160
EICR: from £160
Within the agreed scope
- Visual inspection of the main intake equipment, meter tails, and consumer unit
- Testing earthing arrangements and protective bonding conductors
- Testing fixed circuit wiring including lighting, power sockets, and cooker points
- Checking the correct operation of residual current devices and circuit breakers
- Delivery of a complete electrical installation condition report detailing observed observations
Ways to pay


- Pay by bank
- Bank transfer
- The inspection includes checks of permanent cables, electrical fittings and circuit protection.
- We price fault repairs and replacement parts separately from the inspection.
- Landlord electrical certificates and surveys before a purchase are priced by quotation.
EICR and electrical surveys across Clapham
We serve Clapham from our base in London.
What happens on the day
Our Clapham inspection checks permanent wiring and records its condition in an electrical installation condition report, or EICR. We examine the electrical equipment, test the circuits and record any faults.
- What do you examine first?We begin with the incoming electrical equipment and the consumer unit, the fuse box containing your circuit protection. We examine accessible fittings and open selected sockets and switches to check their connections.
- Which wiring do you test?We test the cables serving lights, sockets and cooker connections. The checks include earthing and bonding, the protective connections that carry electrical fault current and connect metal service pipes to the earthing system.
- When does the electricity go off?We disconnect circuit power for parts of the testing visit. Electrical instruments take measurements while the circuits are disconnected, and we check the devices that switch off electricity during a fault.
- What does the finished report contain?We record circuit readings and the condition of the fittings examined. The report identifies dangerous faults, potentially dangerous faults and recommended improvements, with an overall satisfactory or unsatisfactory result.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose Bello Electrics Ltd
Every project is completed with clear communication, tidy finishes and thorough testing. Bello Electrics Ltd maintains both public liability and professional indemnity cover while delivering dependable electrical work from consumer unit upgrades to full rewires.
Photos of our work
Do you carry out an EICR for a rental property in Clapham?
We carry out EICR inspections and landlord electrical certificates in Clapham. The inspection tests the property's permanent wiring and records defects that need attention.
Can you check the electrics before a home purchase?
We carry out electrical surveys before a purchase to examine the wiring before contracts are exchanged. The written findings identify electrical defects and the work needed to repair them.
How much time does the inspection take?
A domestic wiring inspection takes between two and four hours. The number of circuits, the size of the property and access to electrical fittings determine the testing time.
What happens at the property after booking an EICR?
We examine the electrical supply equipment, accessible fittings and permanent cables during the visit. We then test the circuits and record their readings and any defects in your report.
Will the inspection involve opening walls or floors?
Our standard inspection examines accessible wiring and fittings without opening walls or lifting flooring. We open selected socket and switch fittings to inspect the electrical connections inside.
